4. Repeat step 3 instructions to inflate each chamber to proper Working Pressure shown in
Chart 1 until all chambers are properly inflated.
5. Confirm that suitable anchor(s) and mooring lines are in place before launching this item
(see Anchoring).
6. To launch product, lift completely and place in water. Large items may require many extra
people to accomplish this. Never drag product as damage may occur.
7. When connecting multiple items together, always follow manufacturer's
recommendations. Use only Aquaglide Two-Step Vario-lock cinch straps and connecting
rings. Make sure connection is tight and there is NO GAP between items. Failure to connect
items properly may result in injury or death. See D1 - D6.
a. Attach straps to 'Connectors' (example: Solarium, Swimstep, Splashmat, Speedway,
Breezeway or Deck) where a connection is required. Connectors should not be attached
to other connectors.
b. Use all available rings to make connection. Standard connections use 5 rings. Some
items use 3 or occasionally 7 rings/ straps. Solarium is a connector item with 7-ring sets
on 2 opposite sides and 5-ring sets on 2 opposite ends.
c. Float 'Connector' into desired position. Note: a matching set of connecting rings is
required on feature item.
d. Attach center strap to center ring on feature item. Connect loosely, then work outward
until all straps are connected.
e. Dive beneath to tighten all straps securely. Dive mask and several attempts may be
required.
D-1
D-4
7
D-2
D-5
D-3
D-6
www.aquaglide.com