New Construction Installation - Broan XB50 Guia De Instalacion

Ocultar thumbs Ver también para XB50:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 3

New Construction Installation

Tools needed
• Power screwdriver with a Phillips bit
• Phillips screwdriver
• Flathead screwdriver
• Pliers
• Wire insulation stripper
• Wire cutter
1
Remove Packaging
Parts Bag holds
Knockout Plate
and six (6)
screws
2
Install
Mounting
Frame
Materials needed
• 6" round metal ducting recommended for best performance.
• Roof cap or wall cap (built-in damper recommended)
• Tape to seal duct connections
• Electrical wiring and supplies per local code requirements
4
3
Use of other ducting is acceptable but may impact performance.
Remove
Instruction
Sheet
2
XB50
XB80
XB110 Installation Guide
n
n
Punch out Mask from
packaging. See Step 6.
1

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Xb80Xb110

Tabla de contenido