Chapin 80100B Guia Del Usuario página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
Approximate assembly time is 5-10 minutes
Suggested Tools:
Wrench and/or Ratchet Set
• Remove bottom bolt from each side of handle
(below triangle shaped thumb screws).
• Loosen thumb screws and flip up handle
• Replace bolts below thumb screws and
tighten down.
• Tighten thumb screws completely.
• IMPORTANT: You must remove the
R-pin when applying salt or ice melt ( Figure A).
* Note: If spring detaches from bail assembly,
simply re-attach (see Figure B).
Figure A
GENERAL OPERATING INSTRUCTIONS
• Be sure gate control is in the closed position (do not hold bail down when filling)
• Determine appropriate setting for material being used by reading the suggested setting on the material's bag AND/OR by referencing the
application chart on your spreader's control panel (Charts provided are only guidelines. Be sure to read the instructions on the bag/box of the
material you're spreading to identify accurate setting needed)
• Set the dial to the desired setting Important Note: Do not adjust dial while holding bail down and gate is open. This will alter the accuracy
of gate settings and cause parts to break.
• To begin spreading, start walking (about 3 mph pace) and pull the bail system down to open gate
• To stop spreading simply let go of the bail and the gate will close
BAFFLE OPERATING INSTRUCTIONS
• Adjust baffle by hand to block distribution accordingly.
• Use wing nuts to adjust tension on baffle.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
Bolts
Figure B
Thumb
Screws
Handle

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

80080b

Tabla de contenido