TWO ACRYLIC HANDLE
TUB AND SHOWER KIT
MODELS
10-B82-WCH-B – Chrome tub and shower
PACKAGE AND HARDWARE CONTENTS
PART
DESCRIPTION
A
Shower head
B
Shower arm
C
Shower arm flange
D
Tub spout with diverter
E
Hot handle assembly
F
Cold handle assembly
G
Handle flange
SAFETY INFORMATION
Please read and understand this entire manual before attempting to
assemble, operate or install the product.
WARNING
• Protect your eyes with safety glasses when cutting or soldering water
supply lines.
PREPARATION
Before beginning assembly of product, make sure all parts are present.
Compare parts with package contents list and hardware contents. If any
part is missing or damaged, do not attempt to assemble the product.
Contact customer service for replacement parts.
Estimated Assembly Time: 30 minutes
Tools Required for Assembly (not included): Adjustable Wrench, Groove
Joint Pliers, Pipe Wrench, Phillips Head Screwdriver, Pipe Tape or Pipe
Thread Compound, and Supply Lines
Homewerks Worldwide, LLC • Lincolnshire, IL 60069 • www.homewerksww.com
QUANTITY
1
1
1
1
1
1
A
2
CAUTION
• If you solder the joints during installation of the tub and shower kit,
• Cover the sink drain to avoid losing parts.
Installations may vary depending on how the previous tub and shower
was installed. Supplies necessary for the installation of the tub and shower
are not all included; however, they are available wherever plumbing supplies
are sold.
Prior to beginning installation, turn off the hot or cold water lines, then
turn on the old faucet to release built-up pressure. When installing the
new faucet, hand tighten the connector nuts. DO NOT OVERTIGHTEN.
Connections that are too tight will reduce the integrity of the system.
C
B
E
D
the seats, cartridges, and washers must be removed before using a
flame or the warranty will be voided on these parts.
G
G
04-18-2016