Infiniton CMPTRAL-BT90 Manual Del Usuario página 16

Ocultar thumbs Ver también para CMPTRAL-BT90:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

three marks are leveled.
 Mark a point (3) on the horizontal line C, 80 mm to the right of the vertical reference line.
 Repeat this operation on the other side, checking that the two marks are leveled.
Fix the brackets (Optional):
 Drill at the marked points (1) (2) (3), using a ɸ10 mm drill bit.
 Insert the Wall Plugs 11 into the holes (1) (2) (3).
 Fix the hood fixing bracket 20 with 3 screws 10 (5 x 50) supplied with the hood.
 Fix a Chimney fixing bracket 21 with 2 screws 10 (5 x 50) supplied with the hood.
Hook the hood body:
 Open the panel.
 Remove the Metal grease filter using the handles provided.
 (Either) Hook the hood body to the bracket 20.
(Or) Hook the hood body to the screws 10 (5 x 50) at the points (2).
 Level the hood body itself.
 From the inside of the hood body, fix the screws 10 to Wall Plugs 11 at the points (3).
 Fit the filter into the hood.
 Close the panel.
CONNECTIONS
DUCTED VERSION AIR EXHAUST SYSTEM
When installing the ducted version, connect the hood to the chimney
using either a flexible or rigid pipe ɸ 150 or ɸ 120 mm, the choice of
which is left to the installer.
 To install a ɸ 120 mm air exhaust connection, insert the reducer
flange 3 on the hood body outlet.
 Fix the pipe 4 in position using sufficient pipe clamps (not
supplied).
 Remove possible charcoal filters.
Right
Wrong
EN-6

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Cmptral-wt90

Tabla de contenido