Bradley SN2005/IR Manual De Instalación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Install and Anchor Unit
Rough-in of plumbing lines must be completed before unit
can be properly installed.
A
Remove Access panel and with
the help of another person, place
unit in position.
B
Ensure unit is level, shimming floor unit if
necessary. Using the base as a template,
mark the floor anchor locations.
2
Connect Water Supply to Valve Assembly
A
Connect 1/2" NPT female end of stop/check
valves to supply lines. Connect supply hoses
to hot and cold inlets of the Vernatherm TMV.
Do not turn on water until
Step 3 is completed!
Bradley • 215-1067 Rev. H; ECN 12-00-011
Water Supply Gang
Valve Assembly
(to Aerator)
Yellow Tube
(to Aerator)
(to Aerator)
Vernatherm TMV
Cold Supply Inlet
OPTIONAL TEMPERED LINE CONNECTION: Connect 1/2"
B
NPT female end of stop/check valve to supply line. Connect
Tempered line adapter to Gang Valve Assembly as shown.
15" (381) Dia.
Install a minimum of four 3/8" bolts (supplied
C
by installer) around unit at the marked
locations (eight is recommended). Secure
unit to floor.
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
Clear Tube
Hot Supply Inlet
6/29/12
SN2005/IR
Water Supply Gang
Valve Assembly
OPTIONAL Tempered Line
Adapter Assembly (S39-685)
Braided
Hose
Stop/Check Valve
5

Publicidad

Tabla de contenido
loading

Tabla de contenido