Descargar Imprimir esta página

Eaton Metalux CGTSURF24 Nstrucciones De Instalacion página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

A6. Attach box to ceiling using appropriate hardware
(not included) to secure both short rails and the
long rail with the tether anchors installed to the
surface. Ensure the box remains square when
mounting. The spacing of the mounting slots is 16
inches center-to-center. (Figure 6.)
Figure 6.
A7 . Unscrew and remove the long rail that is not
attached to the surface, as well as the L- brackets,
and retain for reuse. (Figure 7 .)
Figure 7.
A8. Hang the fixture from the 2 tethers by inserting
each toggle through a hole on the grid clip tabs on
each side of the fixture. (Figure 8.)
Figure 8.
Installation Instructions – CGTSURF24
A9. Use flexible metal conduit with 90-degree conduit
fittings to bring supply conductors into the wiring
compartment on the back of the fixture. Wire
according to instructions included with the fixture.
(Figures 9.)
Figure 9.
A10. Slide the fixture completely into the channel
through the open side. (Figure 10.)
Figure 10.
A11. Reinstall the floating long rail, L- brackets and
screws, and affix the included labels to the
floating long rail next to each pair of screws.
(Figures 11 and 12.)
Screws may strip if over torqued.
N
ote:
Floating Long
Rail
Figure 11.
EATON
IB519118EN
Installation instructions
3

Publicidad

loading