OBO Bettermann UDHome2 V Instrucciones De Montaje página 25

Unidad portamecanismos con entalladura de pavimento, con soporte de montaje para sistema modul 45
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
I f necessary, lever out the premarked pipe
entries, e .g . with a Philips screwdriver .
M ove up and down for a small opening,
∅ 20 mm
M ove back and forth for a large opening,
∅ 25 mm
M ount the service unit on the concrete floor
with suitable fastening materials (e .g . an-
chors and bolts) .
I nsert the M20 or M25 installation pipe (ac-
cessory) max . 5 mm into the service unit,
and fix it outside, on the floor .
Tip: If screed laying follows, then place the
mounting support loosely into the service outlet
for storage .
EN
25

Publicidad

Tabla de contenido
loading

Productos relacionados para OBO Bettermann UDHome2 V

Tabla de contenido