Plumbing
01
The plumbing installation
must be completed before
03
the electrical installation.
The shower head should be attached
to the slider rail at a comfortable
height for users.
05
The plumbing installation requires pipes or
reinforced flexible hoses that can withstand
pressure to 101 psi (7 bar) rated for high
temperature applications.
06
Before proceeding to the electrical installation, run water through the
unit for several minutes to flush out any air bubbles from the water line.
While water is running, inspect all fittings and connections for leaks.
02
The top of the heater should be at least 5 ft
(1.5m) above the floor.
04
Residential plumbing
systems with unstable
pressure or pressure
above 72.5 psi (5 bar)
require the application of a
pressure stabilizer valve,
set to
58–72.5 psi (4–5 bar).
5