Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

COMMISSIONING

1. Chose the installation site
 The installation site of the mc 25 must be level and horizontal.
!
Observe the working conditions in chapter safety, section places for use.
2. Prepare the dispenser
 Open the dispenser and tear-off the strap at the
edge (1).
 Pull out the end-sleeves band (2) approximately
20 cm.
3. Prepare the end-sleeve feeder
 Take end-sleeve feeder with proper cross-
section from the accessories box.
Observe to the colour code of the end-
!
sleeve feeder.
 Insert the end sleeves (1) in the guide sideways
until the stop pin is reached.
 Pull the pin (2) upwards, move the end sleeves
to the mark (3) and let the pin go.
Check that the pin has clicked properly
!
into place.
10/12
Diagram 3
Prepare the dispenser
Diagram 4
Prepare the end-sleeve feeder
9

Publicidad

Tabla de contenido
loading

Productos relacionados para GLW MC25

Tabla de contenido