Complete The Installation; Compléter L'installation - Kohler K-1107-L Guía De Instalación Y Cuidado

Bañeras acrílicas de encajonado entre tres paredes
Ocultar thumbs Ver también para K-1107-L:
Tabla de contenido

Publicidad

5.

Complete the Installation

Water-Resistant Wall
Material
Matériau
hydrorésistant du mur
Material de pared
resistente al agua
If applicable, install the optional removable apron at this time. Refer to the
manufacturer's installation instructions.
Apply a bead of silicone sealant to the nailing-in flange.
NOTICE: Provide a 1/4" (6 mm) gap above the bath deck when installing the water
resistant wall material and finished wall material. This gap will create a groove for
the silicone sealant.
Leaving a 1/4" (6 mm) gap between the paperbound edge and the bath deck,
cover the framing with water-resistant wall material.
Tape and mud the water-resistant wall material.
Install the finished wall material 1/4" (6 mm) above the bath deck. This will create
a groove to apply the silicone sealant.
Apply a bead of silicone sealant in the groove between the finished wall and the
rim.
Install the faucet trim according to the manufacturer's instructions.
Compléter l'installation
Si applicable, installer le bandeau amovible optionnel à ce moment. Se référer aux
instructions d'installation du fabricant.
Appliquer du mastic à la silicone sur la bride de cloutage.
1084160-2-B
Furring Strip
Tasseau
Listón de enrasar
Finished Wall Covering
Revêtement de mur fini
Revestimiento de la
pared acabada
Nailing-In Flange
Bride de cloutage
Reborde de clavado
Silicone Sealant
Mastic à la silicone
Sellador de silicona
2x4 Studding
Montant 2x4
Postes de 2x4
12
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido