Hitch Shown In Proper Position
Equipment Required:
F t
Fastener Kit: 24769F
Kit 24769F
Wrenches: 15/16
Fasteners typical both sides
1
Qty. (4)
Hex Bolt 5/8-11 X 4
2
Qty. (4)
Lock Washer 5/8
1.
Place 5/8 bolts into bushing from the outboard side of the frame rails. Leave flush with the inboard frame rail.
2.
Raise hitch into position and push 5/8 bolts through brackets to support hitch.
3.
Attached remaining fasteners as shown.
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
and SAE J684.
z
2006, 2010 Cequent Performance Products
Installation Instructions
Except R/T & SRT4
Drawbar Kit:
Drawbar must be used in the
Rise position only.
Tighten all 5/8-11 fasteners with torque wrench to 100 Lb.-Ft. (136 N*M)
Dodge Caliber
Do Not Exceed Lower of Towing Vehicle
Do Not Exceed Lower of Towing Vehicle
3591
2000 LB (908 Kg) Max Gross Trailer Weight
200 LB (90.8 Kg) Max Tongue Weight
Wiring Access Location: PC1, PC2
3
Qty. (4)
Hex Nut 5/8-11
Sheet 1 of 3
Part Numbers:
Manufacturer's Rating or
3
2
Bushing
24769N
8-26-10
Form F206 Rev A 5605
24769
60832
77145
24732
U-Haul
Frame rail
1
Rev. D