Duronic MPS Manual De Instrucciones página 7

Ocultar thumbs Ver también para MPS:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
Wall Mounted:
Using the holes on the back of the brackets to guide
you, hold the screen up onto the wall where you wish
to install it and mark the two places where you need
to put the screws.
a.
Use a spirit level to check that the screen will
be level and straight on the wall.
b.
Set the screen aside.
c.
Use a drill to make two holes in the places
you marked, ensuring they are the same
size to correspond with your raw plugs. Then
insert raw plugs.
Note: The MPS comes with some standard raw plugs for brick walls;
however you may need to find suitable alternatives depending on the
material of your wall.
d.
Lift the projector screen into place, and using a screwdriver, insert the
screws through the brackets and into the aligning holes. Tighten in
place.
e.
Check to make sure the screen is level on the wall.
Ceiling Mounted:
You can hang your projector from ceiling-height in two ways: directly from the
ceiling using eyebolt screws, or from the top of the wall using spacer brackets.
For both kinds of installation, you may also need S-shaped hooks.
As ceilings can be made of different materials - some weaker than others
- you will need to assess if your ceiling is capable of holding the weight
of the screen and if it's safe to do so. Then, make sure you choose the
right fixings for your type of ceiling.
Spacer brackets
Eyebolt screws
7

Publicidad

Tabla de contenido
loading

Tabla de contenido