Descargar Imprimir esta página

Publicidad

Enlaces rápidos

I
GB
F
D
E
RU
PL
ZKK697 - ZKK698
ZKK673
ZKK108
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it
NIKKO
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
INSTRUKCJE INSTALACJI ARMATURY
ZKK699 - ZKK700
Z92225 - Z92226
ZKK106
Zucchetti Rubinetteria S.p.A.
ZKK701 - ZKK702
ZKK320
ZKK122
ZKK672
ZKK490
ZKK127

Publicidad

loading

Resumen de contenidos para ZUCCHETTI NIKKO ZKK697

  • Página 1 ZKK701 - ZKK702 ZKK672 Z92225 - Z92226 ZKK320 ZKK673 ZKK490 ZKK127 ZKK108 ZKK106 ZKK122 Zucchetti Rubinetteria S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it...
  • Página 2 ZKK697 - ZKK699 - ZKK698 - ZKK700 - ZKK320 INSTALLAZIONE / INSTALLATION...
  • Página 3 ZKK697 - ZKK699 - ZKK698 - ZKK700 - ZKK320 INSTALLAZIONE / INSTALLATION ZKK701 - ZKK702...
  • Página 4 ZKK672 - ZKK673 - Z92225 - Z92226 INSTALLAZIONE / INSTALLATION...
  • Página 5 ZKK672 - ZKK673 - Z92225 - Z92226 INSTALLAZIONE / INSTALLATION...
  • Página 6 ZKK672 - ZKK673 - Z92225 - Z92226 INSTALLAZIONE / INSTALLATION...
  • Página 7 ZKK106 - ZKK108 INSTALLAZIONE / INSTALLATION...
  • Página 8 ZKK106 - ZKK108 INSTALLAZIONE / INSTALLATION...
  • Página 9 ZKK122 - ZKK127 INSTALLAZIONE / INSTALLATION...
  • Página 10 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.
  • Página 11: Maintenance And Care

    • Using a soft cloth with a mild detergent or soap is all that is required to clean surfaces. • Do not use abrasive cream cleaners or citrus based cleaning products. These will damage the surface. • Aerator may be removed and cleaned should it become blocked. WM-004006 AS/NZS 3718-2005 Zucchetti Rubinetteria S.p.A...