Connect the Breakout Cable
CAUTION:
To reduce emissions, connect the far end of the Breakout cable
shield to frame ground.
Note: Exposed wires can be cut short or wire ends trimmed, and the wires tied
back using a tie made of non-conductive material. Keep all bare wires
separated from the +24VDC wire.
1. Verify that the 24VDC power supply being used is unplugged and not
receiving power.
2. Optionally, connect the I/O or serial wires to an appropriate device (for
example, a PLC or a serial device).
3. Attach the Breakout cable's +24VDC (Red wire) and GND (Black wire) to
the corresponding terminals on the power supply.
CAUTION:
observe the polarity shown.
4. Connect the Breakout cable's M12 connector to the vision system's PWR
connector.
5. Restore power to the 24VDC power supply and turn it on if necessary.
Install Software and Documentation
To configure an In-Sight vision system, In-Sight Explorer software must be installed
on a networked PC. In-Sight software is available as a free download from the In-
Sight support site: http://www.cognex.com/Support/InSight.
Never connect voltages other than 24VDC. Always
11