Flush the water supply lines before beginning installation and after installation is complete. Test
the unit for leaks and adequate water flow.
Main water supply to the unit should be "ON" at all times unless system is being serviced.
Provisions shall be made to prevent unauthorized shutoff.
Power supplied to the unit should be 120VAC or 220-240VAC, 50-60 Hz, 15 amp branch circuit with
a dedicated circuit breaker or fuse and should not supply power to any other device. Compliance
and conformity to local codes and ordinances is the responsibility of the installer.
Do not use this safety equipment in a location that does not match its hazardous location rating.
Verify the appropriate ratings prior to installation.
When making electrical connections be sure to follow all lockout-tagout safety procedures.
Emergency equipment must be supplied with tepid water (60-100°F/15.6-37.8°C). Any prolonged
exposure to near freezing water affects the body's ability to maintain body temperature, increasing
the risk of hypothermia.
Before installing this product ensure that there are adequate clearances around the product and
activation of the product does not interfere with other products or obstructions.
It is recommended that all water supply and electrical connections be made at temperatures above
freezing. Failure to do so may result in major product and/or property damage.
Constant power supply to the safety equipment is necessary for it to function.
Avoid cleaners containing organic solvents, alcohols and hydrocarbons. Rinse with potable water
after cleaning.
2
WARNING
CAUTION
NOTICE
6/5/2017
Bradley • 215-1082 Rev. L; ECN 17-05-045
Installation

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-300b

Tabla de contenido