Installation

Supplies Required
(3) ³⁄₈" floor anchors and bolts
Teflon tape and pipe sealant
Piping to 1¼" NPT water supply inlet on unit with
adequate supply pipe supports
Minimum 4" drain to accommodate 30 gallons
per minute discharge for drench shower waste
Electrical supplies to connect to unit junction box
NOTICE!
Bottom supply units have provisions for
supporting the top of the unit. The 1¼"
NPT solid pipe protruding from the shell
must be used to support the unit.
Secure unit to floor
1 . Install three suitable anchors (supplied by installer) for
³⁄₈" bolts in the floor .
2 . Bolt the base to the floor anchors using ³⁄₈" bolts
(supplied by installer) .
3 . Install the pull rod to the unit as shown .
NOTICE!
Do not rely on unit to support supply
piping.
WARNING! Unit requires a minimum 30 GPM to
operate and a minimum 30 PSI of flowing
water pressure. Preferred flowing water
pressure is 40–60 PSI. Water supply to the
unit must be freeze-protected (by others).
NOTICE!
Pipe size should be no smaller than 1¼"
(supplied by installer).
Connect water supply
1 . Connect the water supply piping to the 1¼" NPT inlet
on the unit (piping by installer) . Use pipe hangers or
other means to provide adequate supports for the
supply pipe (supports by installer) .
2 . Open water supply lines and test for leaks and
adequate water flow .
Assemble components
1 . Install the showerhead to the unit as shown . The bottom edge
of the showerhead should be 85¼" (2165mm) from the floor .
2 . Mount the safety signs to the wall or to the unit if desired . Use
the screws, nuts and hooks provided to hang the signs back-to-
back on the unit .
Connect electrical supply
1 . Connect the power to the junction box on the unit as shown in
the schematic on page 4 (junction box accepts ¾" NPT conduit
fittings) .
2 . Connect the optional alarm system and indicator light as shown .
Average power consumption of the unit is .7 amp/80 watts at
120VAC (.35 amp/80 watts at 220/240 vac) at 50°F (10°C)
internal unit temperature. Refer to the installation instructions
provided with the alarm system for more information.
CAUTION Any electrical components supplied by
installer must match the rating of the
fixture to maintain its integrity.
Bradley • 215-1082 Rev. L; ECN 17-05-045
Junction
Box ¾"
NPT Hub
(2405mm)
60¾"
(1543mm)
43"
39½"
(1089mm)
(1004mm)
Ø 9" (229mm) Flange
with (3) Ø 3⁄8" (10mm)
Holes on a Ø 8"
(203mm) Bolt Circle
Use teflon tape
only with plastic
showerheads .
Safety signs
shown mounted
back-to-back .
6/5/2017
S19-300T, S19-300B
Top Supply
37¾"
(959mm)
25¾"
(654mm)
94⁵⁄₈"
85¼"
(2165mm)
68"
(1724mm)
35½"
(900mm)
Bottom supply units
must use this pipe for
supporting unit .
Box opening
1¼" NPT
92"
(2337mm)
6"
(152mm)
Bottom
Supply
1¼" NPT
¾" NPT
Junction
5

Publicidad