Assembly Of The Control Cabinet; Selecting The Location; Technical Data - Graf UP Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Assembly of the control cabinet

3.1

Selecting the location

When selecting the location for the control cabinet, the following must be considered:
The control cabinet must be mounted above the highest water level in the tank to avoid overflow-
ing and water intake by gravity in case of an accident.
The system generates noise! When operating, the air compressor generates continuous noise
(comparable to that of a freezer).
The machine cabinet requires a separately protected electrical connection (16 amp, slow blow).
The electrical connection serves as a mains disconnecting device and must be easily accessible
at all times. Additional electrical fixtures on the same fuse may disrupt operation.
The location of the control cabinet must be a dry, cool and well-ventilated room. The cabinet, in
particular the ventilation vents, must not be covered and must be freely accessible for mainte-
nance work.
The air hoses should be no longer than 20 metres.
3.2

Technical Data

Model:
IP20
Material:
PP
Color:
black
Shutting:
Screw lock centered at the front cover
Electrical connection:
Back-up fuse required on site
1 ~ 230V, 50 Hz
Connections at the cabinet:
Compressed air nozzles: 2 x 19 mm
Connection cable with plug type E+F
3. Assembly of the control cabinet
280
420
Dimensions of the PP Cabinet
/

Publicidad

Tabla de contenido
loading

Tabla de contenido