Parts Included
A. 4 (27 Quart) Bins
B. Wire Support Frame
C. Sliding Base Assembly
D. Mounting Screws
A
B
C
Mounting
Straps
Sliding
Members
Tools Required
• Phillips screwdriver
• Tape Measure
• Pencil
• Drill with 1/16˝ bit for pilot
holes (optional)
Product Assemblies
PRC24-4-27
2700 Oak Industrial Drive NE , Grand Rapids, MI 49505 USA
800.253.1561 • 616.459.3311 • www.kv.com
4-BIN RECYCLING CENTER
Installation Instructions
Inspect all parts and read all instructions prior to
beginning assembly and installation.
Place sliding base assembly on cabinet floor, centered behind the back
1
edge of the cabinet face frame. If installing in a frameless cabinet
measure 3/4" back from front of cabinet opening, and align sliding base
assembly parallel to cabinet opening. Close door to make sure the assembly
will not hold cabinet door open. Also, check to see if unit will clear the door
opening when fully extended. Once position is determined, fasten in place
using four mounting screws provided and the Phillips head screwdriver.
Optional Step
Mark placement of mounting holes with a pencil, remove sliding base
assembly and drill pilot holes for fastening screws. Place sliding base
assembly back into position and fasten with the provided screws.
If sliding members are fully extended, return to closed position. Hold the wire
2
support frame over the sliding base assembly so that the frame aligns with
the clip retainer built into the side of the sliding members. Pushing firmly,
lower wire frame into clip retainers until firmly seated. Insert bin(s) into wire
support frame to complete the installation.
D
1
©2009Knape & Vogt. All rights reserved. Knape & Vogt
A
Top View
Overall Cabinet Width:
BIN
BIN
PRC24-4-27
reserves the right to change specifi cations without notice. Made in USA.
®
,
2
Clip
Retainer
24"
BIN
BIN
310164-0609