Baker Hughes Druck PV 62 Serie Guía De Referencia Rápida página 11

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
S3 PV 623-IS models: Start operations
S3.1
Fill the reservoir.
time, use this procedure to fill the reservoir:
Step
Procedure
Use the applicable adaptor to
1.
attach the device; figure A3.
Remove the hydraulic pressure
2.
release valve.
Use the refill bottle to add the
3.
necessary hydraulic fluid but leave
a small air gap.
S3.2
Release the pressure/Attach the device under test
1
Note: Fill the reservoir before attaching to the device. See figure A4 (front cover).
S3.3
Hydraulic pressure operation
1
2
Step
Procedure
Seal the system.
1.
Close the refill valve and then wind
2.
the volume adjuster fully clockwise
and counter-clockwise until the
pressure starts to increase.
The counter-clockwise operation
refills the pressure mechanism without a
change in pressure.
[EN] English - K0463 Revision A
Figure A4 (front cover). Using the hydraulic pressure station for the first
2
4
4
2
3
+
4
10
9
Step
Procedure
To remove air from the pressure
4.
mechanism, wind the volume
adjuster through one full cycle
(counter-clockwise then clockwise).
Seal the system and continue with
5.
the normal pressure operation.
Step
Procedure
Release the pressure: Open the refill
1.
valve (1 turn) then fully open the
pressure release valve.
Use the applicable adaptor to attach
2.
the device; figure A3.
-
+
Step
Procedure
Opening the refill valve (1 turn)
3.
gives full control to increase (+) or
decrease (-) the pressure with the
volume adjuster.
If increasing pressure and get to the
4.
limit of travel, close the refill valve
again and wind the volume adjuster
fully counter-clockwise.
Continue to do steps 2 to 4 until the
5.
necessary pressure is acheived.
A2.3 (Front cover)
4
Quick Reference 5
9
4
10
4
2
10
9
10
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Druck pv 621-isDruck pv 622-isDruck pv 623-is

Tabla de contenido