Robern Uplift Tech Ganging Kit Instrucciones De Montaje página 9

Tabla de contenido

Publicidad

SURFACE MOUNT
7. Hang the next cabinet on the right facing mounting bar and push it to the left against the spacer. Install the 4 lower mounting clips
onto the cabinet as shown in the Cabinet installation instructions / Surface Mount installation instructions.
8. Secure cabinet to the 2x4 support with two #10 screws supplied with cabinet as shown below. Apply screw caps and plugs supplied
with the cabinet.
NOTE: If you selected the optional Top and Bottom Kit (UTKxxD6A) proceed to step 9.
9. Peel paper backing from the top and bottom covers and apply to one of the top and bottom kits, sticky side down, and align to the
edge of the support channels.
10. Dry fit the Top and Bottom assembly before adhering to the cabinet. Apply side A first, then side B.
11. Complete installation using instructions supplied with cabinets.
7
9
© 2019 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation instructions
SEMI RECESSED GANGING INSTALLATION
8
A
10
9
B
25.000
25.000
Part no. 209-1318-A rev. 08/21/19
Ganging Kit

Publicidad

Tabla de contenido
loading

Tabla de contenido