Installing The Radio Link; Tools Required - Waeco PerfectView RV-FM-10 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
_RV-FM-10.book Seite 23 Mittwoch, 11. Januar 2006 11:03 11
All manuals and user guides at all-guides.com
PerfectView
6

Installing the radio link

6.1

Tools required

For installation and assembly you require the following tools:
Drill bit set (fig. 1 1, page 2)
Drill (fig. 1 2, page 2)
Screwdriver (fig. 1 3, page 2)
Set of ring or open-ended spanners (fig. 1 .4, page 2)
Measuring ruler (fig. 1 5, page 2)
Hammer (fig. 1 6, page 2)
Centre punch (fig. 1 7, page 2)
For making and testing the electrical connection the following tools are re-
quired:
Diode test lamp (fig. 1 8, page 2) or voltmeter (fig. 1 9, page 2)
Crimping tool (fig. 1 10, page 2)
Insulating tape (fig. 1 11, page 2)
Cable bushing sleeves, if required
To fasten the modules and the cables, you may need additional screws
and cable binders.
6.2
Installing the modules
Warning!
Select the location of the modules so that they cannot injure the
passengers in the vehicle under any circumstances (e. g. sudden
braking, road traffic accidents).
Observe the following instructions during installation:
Select a suitable location protected from moisture within the vehicle.
The installation location should be flat.
Installing the radio link
23

Publicidad

Tabla de contenido
loading

Tabla de contenido