EdilKamin COCLEA Instalación página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
SCREW FEEDER 300 cm
List of components:
A = pipe with hollow part L= 1.0 m
B = curve
C = straight element L= 1.5 m
G = flexible pipe connection flange
H = flexible pipe
Q = gear motor unit
Z = collar for suspension (optional - code 748060)
STEP 1:
• Secure the pipe (A) with the hollow part (*), facing upwards, to
the curved pipe (B) using the M6X20 screws and M6 nuts supplied.
• Position and secure the collar (W) to the pipe (A) at 120 -
140 mm from the joining point of A and B.
STEP 2:
• Fix the 1.5 m pipe (C) to the pipes (A + B), previously assem-
bled using the M6X20 screws and M6 nuts supplied.
STEP 3:
• Slip the flexible spiral (**)already cabled to the gear motor unit
(Q), inside the pipes (A + B + C) previously assembled, until the
flange of pipe C is coupled with that of the gear motor unit.
STEP 4:
• Complete the operation by securing the gear motor unit (Q) to
the pipes (A + B+ C) using the M6X20 screws and the M6 nuts
supplied.
STEP 5:
• Secure the flexible pipe connection flange (G) and the flexible
pipe (H) to the boiler as indicated on the technical data sheets
of the hoppers.
STEP 6:
• Represents the screw feeder assembled from the external
hopper to the boiler.
STEP 7:
• Suspend the screw feeder from the ceiling using the optional
collars (code 748060) levises supplied.
STEP 7
Z
STEP 6
INSTALLATION
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5
- 12
-
B
W
A
*
B
A
C
B
A
B
A
W
C
Q
**
Q
C
H
G

Publicidad

Tabla de contenido
loading

Tabla de contenido