Scope Of Delivery; Assembly And Disassembly; Assembly Of Base Plates; Installation Sequence - Nemaxx 330 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

● SCOPE OF DELIVERY
● Floating body
● Aluminium floors
● Side profiles (side joiner)
● Repair kit
● Instruction manual
● Transport bag
● Benches
● Paddles
● Foot pump with manometer
● ASSEMBLY OF BASE PLATES
NOTE: The floor plates must be installed in the boat before the boat is inflated.
1. Clear a level surface that is clean and free of sharp objects.
2. Unfold the boat and lay it flat.
3. Fasten the valves in place. Check that the cap gasket is properly seated and attach the valve holder to each
valve.
4. Slide the front bottom plate (no. 1) into the bow. Position the opening above the keel air chamber valve. Join
the base plate (no. 2) with the front base plate.
5. Slide the rear base plate under the mirror holder (no. 4).
6. Assemble the remaining base plates. Position the middle base plates so that they form an inverted V-shape.
Align the side edges of the base plates straight and then press on the V-profile to level the base plates.
installation
sequence
NOTE: The floor panels are reinforced by the side profiles installed on the panels. Position these side profiles
so that they are inserted between the rubber stops on the side air chambers.

ASSEMBLY AND DISASSEMBLY

press down
2
1
stern
3
4
[ EN ● 10 ]
Version: 1.2
KEN002ZB 02.02.2020

Publicidad

Tabla de contenido
loading

Tabla de contenido