SUPAIR SHINE Manual De Usuario página 35

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SHINE reserve parachute's manual SHINE
Installing the reserve parachute
3.Installing the parachute in its container.
Weather you have an outer front container or an integrated reserve parachute pocket in your harness, proceed with the installation according to the
manufacturer's guidelines.
Check the completed installation during a hang-test.
After installing the reserve parachute in its container, it is mandatory to conduct a hang-test. Be certain for the handle to open all the container flaps
prior the parachute extraction while evaluating the force amount exerted during the pull to jettison
Have the installation checked by a professional outfit.
Conduct an extraction test every six ( 6 ) months to ensure proper system functionality.
Note : conducting a hang-test extraction does not imply deploying the reserve parachute which will stay inside its POD.
Advise : In order to guaranty a quick opening speed and a sound structural integrity, your reserve parachute must be repacked every six months.
Take advantage of the repacking procedure to conduct a hang-test extraction.
Reserve parachute folding and installation inside the harness must conform to the specific
guidelines found in this manual.
SUPAIR is not liable for any other use or installation.
SUP'AIR
_SHINE
Page 13

Publicidad

Tabla de contenido
loading

Tabla de contenido