Installation
NOTICE
Installation diagrams for specific system models can be found on
pages 6-7 of this manual.
Unpack the contents of the U-M311 carton and confirm all
components are present in the kit. A complete kit includes
monitor, flow meter, meter cable, power transformer/cable and
monitor mounting hardware. If any components are missing,
please contact your Watts representative.
1. Install the 1" flow meter in the conditioned water outlet line of
the system it is monitoring. The arrow on the flow meter must
point in the direction of water flow. See Figure 1.
Use PTFE plumbing tape only on the meter threads.
2. Lift up on tab at bottom center of U-M311 monitor display
screen and separate display screen from base. A small
amount of force will be required for separation due to the
internal interconnecting plug between the base and monitor.
See Figure 2 for display screen and base separation.
3. Mount the U-M311 monitor base to the mounting surface.
Mounting hardware is provided for drywall mounting. Installer
to provide additional hardware for alternate mounting
surface types.
See Figure 2 for mounting detail.
!
WARNING
Locate any hidden electrical wires or plumbing before drilling
into mounting surface to mount monitor. Select mounting loca-
tion to ensure monitor will not come into contact with water of
any kind.
Figure 1
4. Press monitor display fully into base to mount display screen
to base.
NOTICE
Meter and power cables are 69" long. Select monitor mounting
location to accommodate connection to meter and electrical outlet.
Monitor
Base
Monitor
No. 6
Screen
Screw Size
5. Connect monitor cable to meter cable.
6. Plug power supply transformer into GFCI electrical outlet and
follow the instructions beginning on page 7 for product set up
and operation.
5
Pre-Drill
Hole Size
3
⁄
"
32
*Mounting Surface
Anchor for No. 6
Screw Size
*Do Not Use If Wood Stud Is Located
Figure 2
Mounting
Surface