ledscom LC-SS-9148 Instrucciones De Montaje página 5

Columna de enchufes
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 8
1. Disconnect the building-side connecting
cable from the power supply and secure it
against being switched on again. To do
this, trip the corresponding circuit breaker
of the house installation.
2. Guide the building-side connection
cable through the cover of the junction box
as shown in Figure 1. Connect the
connection cable to the luster terminal as
shown in Figure 2 and seal it in the
connection box (1).
3. Now mount the socket column on solid
ground or with a ground spike using the
enclosed screws and dowels.
4. Turn the power back on. The installation
is completed.
Subject to technical changes
LEDs Com GmbH, Dohrweg 2a, D-41066 Mönchengladbach, www.leds-com.de, Tel. +49 (0) 2161 - 5 75 99 76
English
Figure 1
1: Connection box
Figure 2
Socket column (LC-SS-9148) - Assembly instructions
2: Screws
05/2022

Publicidad

Tabla de contenido
loading

Tabla de contenido