ASSEMBLY INSTRUCTIONS
Step 1:
Remove stone top and the packaging material under the
stone top.
Step 2:
a. Apply a thin bead of silicone compound (not included) to
the top of the vanity base (B).
b. Align the back of the vanity base (B) and put the stone
top (A) on the vanity base (B).
Step 3:
Attach center support frame (E) to metal legs (D) by
inserting the bolts (BB) through lock washers (DD) and
flat washers (EE). Then, attach support leg (F) to center
support frame (E) by inserting the bolts (BB) through lock
washers (DD) and flat washers (EE). Tighten with hex
wrench (FF).
Hardware Used
BB
1/4 x 1/2 in. Bolt
DD
Lock Washer
EE
Flat Washer
FF
Hex Wrench
v
1
v
2
A
B
v
3
D
F
x 6
D
x 6
E
x 6
BB
x 1
3
ASSEMBLY INSTRUCTIONS
Step 4:
Attach center support frame (E) and metal legs (D) to the
vanity base (B) by inserting the bolts (CC) through lock
washers (DD) and flat washers (EE). Tighten with hex
wrench (FF).
Hardware Used
CC
1/4 x 1-3/4 in. Bolt
DD
Lock Washer
EE
Flat Washer
FF
Hex Wrench
Step 5:
Mark wall for vanity placement and note the location of the
water supply lines and drain on the back panel of vanity.
Silicone
Step 6:
Move vanity (B) into proper place against the wall.
EE
DD
v
4
B
x 10
x 10
EE
D
x 10
DD
x 1
v
5
v
6
B
4
D
E
CC