West Marine BilgePro 1600 Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ENGLISH
Model 7923642 BilgePro
Model 7923659 BilgePro
12V submersible bilge pump for pumping bilge water in marine environment. To be installed in the keelson.
Security
The pump may not be used for liquids other than water/bilge water.
Always install the pump according to the wiring diagram, see pages 10-11.
Always use the fuse required, see "Specifications" below.
The wire connections must be sealed with a marine sealant.
Insulation or cable sheathings must be placed above the highest bilge water level.
Do not run dry.
Specifications
Hose size
Capacity, straight (13.6V)
Capacity, 1m head (13.6V)
Voltage
Amperage
Fuse size
Body
Shaft
Shaft seal
Wire size
Max height
Max dia.
Weight
Installation
Please follow the installation instructions carefully to assure maximum efficiency in your bilge
pump operation.
1. Remove the strainer from the bottom of the pump by depressing the lock tabs on both sides
of the pump.
2. Determine the desired location for the pump. Usually it is placed in the lowest point of the bilge.
3. Position the strainer so that the pump nozzle is in the proper position to connect to the discharge hose.
4. Mount the strainer. If attaching the strainer to wood, fasten with stainless steel screws. If attaching
the strainer to metal or fiberglass, first mount a wooden block and then fasten the strainer to the
wooden block.
5. Mount the pump on the strainer so that both locktabs "snap" into place.
6. The pump is now equipped with 1-1/8" (29mm) or 1-1/4" (32mm) barbed ports. The port threads into
the discharge area of the pump. To install the check valve, place stainless steel washer into the dis-
charge area of pump. Next place the Nitrile flapper over the washer. Then thread on port [1-1/8" (29mm)
barbed or 1-1/4" (32mm) barbed] on to pump's discharge. Tighten port until port is bottomed out with
pump body. NOTE: The check valve supplied with your pump is used to prevent the backflow of water.
The utilization of the check valve requires you to be mindful of its functionality. The check valve material
is made of Nitrile material to be used for water applications only. Also, the check valve will reduce the
flow of the pump. The purpose of the check valve is to minimize back flow of water, however, over time
water will seep back into the hull when the pump is not running. If flow is critical to the application

BilgePumpMan_100-00.indd 
1600
2200
1600
1-1/8" (29mm) or 1-1/4" (32mm)
1600 gph (6055 Lph)
1450 gph (5490 Lph)
12V DC
7A
10A
Thermoplastic
SS2343/AISI 316 Stainless Steel
Lip seal
16 GA (1.5mm)
6" (152mm)
4-1/4" (108mm)
2.9 lb (1.3 kg)
2200
1-1/8" (29mm) or 1-1/4" (32mm)
2200 gph (8328 Lph)
1800 gph (6810 Lph)
12V DC
7.5A
12A
Thermoplastic
SS2343/AISI 316 Stainless Steel
Mechanical seal, carbon/ceramic
16 GA (1.5mm)
7" (177mm)
4-1/4" (108mm)
5 lb (2.3 kg)
/1/0 1:0:1 PM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bilgepro 2200

Tabla de contenido