INSTALLATION PROCEDURE / STEP 8
1-2. Install roller right(14-1) and roller left(15-1) on the moving door and use roller cap to cover roller.
8
3-4. Install handle(19) and fasten it.
5-6. Install water-retaining seal gasket(17) and closing seal(16) on the moving door.
LEFT HAND ASSEMBLY
RIGHT HAND ASSEMBLY
- 10 -