Descargar Imprimir esta página

Rev-A-Shelf 8-700411-20 Instrucciones De Instalación página 2

Publicidad

STEP 1
Line up the template as shown
in Fig A. Score mounting
points for the top & bottom
brackets on the cabinet wall.
Line up the template as shown
in Fig B. Score mounting
points for the cam guide on
the cabinet door. For frameless
installations, pre-drill with a
2mm drill bit."
Note: For face frame
installations, use the bottom
space block to raise the
template off the cabinet floor.
2mm
STEP 2
Face Frame Installations Only
Mount the side spacer blocks
(not included) over the scored
mounting points for the top
and bottom brackets. The
side spacer blocks should be
sized to allow mounting of
the brackets in-line with the
face frame opening. Mount
the included bottom spacer
block over the single scored
mounting point on the cabinet
floor. Use the template to
score mounting holes on top
of the installed spacer blocks.
Pre-drill with a 2mm drill bit
(See Figure C).
2mm
STEP 3
Fasten the top bracket, bottom
bracket, and cam guide into
the cabinet side or side spacer
blocks using (7) 4x15mm pan
head wood screws. Fasten the
bottom bracket to the cabinet
floor or bottom spacer block
using (1) 3x15mm flat head
wood screw.
2
FIG. A
FIG. C
FIG. D
Face frame
Customer Service: 800-626-1126 | rev-a-shelf.com
FIG. B
Spacer blocks
FIG. E
Frameless

Publicidad

loading