Installation and Connections / Instalaci
ón y conesiones /
1.
Install valve body and plumbing, figure 1.Note:
Face of plasterguard (1) should be flush
with finish wall line.
Instale el cuerpo de la
válvula y el fontanería, figura 1. Nota:
debe estar al ras con la pared.
保护套 (1) 应与墙面平齐.
按照图1安装阀体和管道。注意:
(1)
및배관.
보호 슬리브
커버 벽면과 일치할것.
주의:
1A.
1B.
1
1 5/8"
(42 mm)
1"
(25 mm)
4 1/8"
(105 mm)
4 1/8"
(105 mm)
Hole Size
Tamaño de Agujero
钻孔尺寸
홀사이즈
2E.
2D.
G 1/2 -
ISO228/1
"
"
15/16
~1 3/16
(25mm~30mm)
1 3/16"~1
15/16"
(30mm~50mm)
G 1/2 -
ISO228/1
85261
Rev. D
安装和连接 /설치 및 연결을
Install trim figure 2.
2.
Instale la guarnici
ón, figura 2.
Manguito protectorial (1)
按照图2安装明处部分。
2A.
2B.
2C.
3.
Check for correct operation, figure 3.
Pruebe si funciona correctamente, figura 3.
按照图3检查龙头工作是否正常。
3B.
3A.
3C.
2
3D.
3E.
Parts / Piezas / 零件图 / 부품
RP48959
ISH52022
RP196
RP48007
26575-VO
RP49305
RP76205
Maintenance / Mantenimiento / 维护 / 유지
4.
Replace the ceramic cartridge, figure 4.
4
按照图4更换阀门系统。
4
4.
RP48963
RP46868
RP40709
RP91071
RP46866
RP76211
RP48023
3
85261
Rev. D