Descargar Imprimir esta página

FTE univers U+ WB1-7-OCPP-LK7 Manual Del Usuario página 21

Publicidad

Idiomas disponibles

Idiomas disponibles

User's manual · WB1-11-OCPP-LK7 & WB1-11-OCPP-
3 Operation Instruction
3.1 Installation Preparation
1. Tools required
Tool Name
Multimeter
Cross Screwdriver
(PH2x150mm, PH3x250mm)
Insulated Torque Wrench
Electric drill
Diagonal Pliers
2. Cables & Materials
Name
Power supply cable
3.2 Installation Process
1) Installation Notice
Electrical devices should only be installed, operated, and maintained by qualified personnel.
No responsibility is assumed by the manufacturer for any consequences arising out of the
use of this device. A qualified person is one who has certified skills and knowledge related to
the construction, installation and operation of this type of electrical device and who has
received safety training to recognize and avoid the hazards involved.
All applicable local, regional, and national regulations must be applied when installing, repairing
and maintaining this device.
RCD of the charger is integrated 6mA DC, please install a Type A or Type B breaker outside.
2) Checks before starting the Installation Process
Ensure the charger's location allows good operational access for normal use and repair &
maintenance.
The AC input components within the premise's power supply are correctly fitted with required
protection items prior to installation of the charger.
Technical changes and mistakes reserve
User's manual · U+ WB1-7-OCPP-LK7 / U+ WB1-11-OCPP-LK7
Photo
Single-phase or three-phase power supply cable Depend on actual requirement
-4- u+
User's manual · WB1-11-OCPP
Check electrical connection and electrical
Specification
WB1-7-OCPP-LK7 / U+ WB111-OCPP-LK7 Versión en_1.0 Univers by FTE
Function
parameter
Tighten the screws
Tighten the bolts
Hole on the wall
Cut cables
Quantity

Publicidad

loading

Este manual también es adecuado para:

Univers u+ wb1-11-ocpp-lk7