User's manual · WB1-11-OCPP-LK7 & WB1-11-OCPP-
User's manual · U+ WB1-7-OCPP-LK7 / U+ WB1-11-OCPP-LK7
3) Installation Procedure
1. Based on the profile of the attached installation board, drill 3 x Φ 6 * 35 mm holes on the wall,
and insert the expansion pipe.
2. Lock the 2 x M4*32mm self-tapping screws into the expansion pipe, leaving a 5mm space,
between the screw head to the wall.
3. Open the upper cover of EV charger, hang it on the 2x M4*32 mm self-tapping screws, lock it
into the bottom M4*32 mm self-tapping screw and then cover the sealing cap.
4. Connect wires to the connectors (Refer to Section 4.3), close the upper cover, and lock it with 2
x M4*12mm screw.
Technical changes and mistakes reserve
User's manual · WB1-11-OCPP
-5- u+
WB1-7-OCPP-LK7 / U+ WB111-OCPP-LK7 Versión en_1.0 Univers by FTE