Descargar Imprimir esta página

Eco-Smart SUNPAD Instrucciones De Montaje página 65

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5-45°
20°
2
Check the installation of the SUNPAD system
2.14
Is the safety valve free of all insulating materials?
Has the installation system been checked for visible damage?
2.15
Has the original heating element been installed by an approved electrician?
2.16
Has the heating element been installed according to the enclosed installation instructions?
2.17
Has the cold and/or hot water been connected correctly?
2.18
Date of fi lling
Date of initial commissioning
30°
Registration
Lista di controllo per la messa in funzione
Points à vérifi er lors de la mise en service
Lista de verifi cación para la puesta en marcha inicial
Lista de verifi cação para o comissionamento inicial
Signature / stamp of installer
EN
Checklist for fi rst start-up
Yes
No
65

Publicidad

loading