3. Nameplate
Fig. 2
Nameplate
Pos.
Description
1
Product number
2
Type designation
3
Serial number
4
Model number
5
Production code (year and week)
6
Maximum system pressure [bar]
7
Production company
8
Notified body
9
Marking
10
Total tank volume [l]
11
Effective tank volume [l]
12
Precharge pressure [bar]
13
Maximum operating temperature
14
Minimum operating temperature
4. Installation
Warning
Installation and operation must comply
with local regulations and accepted
codes of good practice.
Before installation, check the following:
•
Do the specifications of the GT tank correspond
to the order?
•
Are all visible parts intact?
•
Is the maximum system pressure lower or equal
to the maximum operating pressure for the
GT tank? See tank nameplate.
6
4.1 Lifting the tank
If the GT tank incorporates lifting eyes, all lifting eyes
must be used.
Right
Fig. 3
Lifting the tank
4.2 Location
Always install the GT tank in the discharge pipe as
close to the pump as possible.
Install the GT tank in a frost-free room. It must be
possible to inspect the GT tank from all sides.
The gas-filling valve, water shut-off and discharge
must be accessible, and the nameplate must be
visible.
Install the GT tank so that it is not stressed by the
pipework. If vibrations are likely to occur, we
recommend that the GT tank is installed so that
vibrations are absorbed.
We recommend to follow these steps:
1. Lift and position the GT tank.
2. Level as required (horizontally and vertically).
3. Secure the GT tank.
4. Connect the pipes and fittings.
5. Check/adjust the precharge pressure.
6. Start the pump or application.
No additional loads from the piping system or
equipment are allowed.
Wrong