Assembly - Greencut BAS130C Manual De Instrucciones

Bomba sumergible
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

41

ASSEMBLY

1. Remove rubber protections and nuts from the connecting screws and the motor drive shaft.
EN
2. Remove the side guide to pass the cable.
3. Assamble the pump on the motor, using the cable guide and screws as a guide.
4. Tighten the nuts rmly (high performance adhesive is recommended).
5. Insert the blue cable into the side guide and screw it back into the pump body.

Publicidad

Tabla de contenido
loading

Tabla de contenido