www.saniflowcorp.com
Open the liner dispenser with the special key provided. The four holes for mounting the liner dispenser on
the holding structure of the changing station will be visible.
Fit the dispenser to the holding structure of the changing station and align the mounting holes of the
dispenser.
Fix the liner dispenser to the holding structure of the changing station using the four M4x8mm screws and
the four DIN125 M4 flat washers, as shown in the figure. Check and make sure it has been properly fixed.
Step 5. Final revision before commissioning
Thoroughly clean and disinfect the baby changing station. It is very important to verify that the unit opens
and closes smoothly and that no damage has been caused during installation of the changing.
In
summary, it is very important to verify, once the installation of the baby changing station is complete, that it
is in perfect condition to be used without any problems.
-7-