Descargar Imprimir esta página

Pfister VTP-E21W Manual De Instalación página 4

Ocultar thumbs Ver también para VTP-E21W:

Publicidad

Idiomas disponibles

Idiomas disponibles

13 UNIT START UP
Turn on Main Water Supply Valve and check for leaks.
14
14C
14 TANK LID INSTALLATION
Place Tank Lid (14A) on top of Tank (14B). Be sure Lid Lip (14C) covers the top of
Tank (14B).
15
15B
15 FLUSHING
Press Flush Button (15A) to activate flushing mechanism. Flushing Button (15A)
comes with Full Flush (15B) and Reduced Flush (15C). Check for leaks above and
below the toilet.
16
16B
16 SECURING TOILET BOWL
Secure Toilet Bowl (16A) to the floor surface by placing a bead of sealant around Toilet
Bowl Base (16B). (Sealant not included). Please follow manufacturer's instructions
when using sealant.
14A
14B
15C
15A
16A
ENGLISH
17
A
B
17C
17D
17B
17F
C
17 TOILET SEAT COVER INSTALLATION
A. Push Spacer (17C) under Seat Holes (17B) by aligning tabs into slots.
B. Place Screw (17C) into Washer (17D), insert into Seat Holes (17B). From below Toilet
Bowl (17E), twist Nut(17F) onto Screw (17C). Align Seat with Toilet Bowl before final
tightening. Use screwdriver to hold Screw in place while tightening Nut.
C.Push in Caps (17G) over Seat Holes (17B) as shown.
4
17A
17E
17G
17B
17B

Publicidad

loading

Este manual también es adecuado para:

Vtp-e31w