Descargar Imprimir esta página

BYK haze-gard i Family Instrucciones Resumidas página 10

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44
haze-gard i Family
6 Project Management
Open an existing project or create a new one, measure samples and store data automatic-
ally. A project consists of standard, test series and samples; path to a measurement is given
in top row. Tap on a part of the path to go to that level.
1.
In the main menu select Projects.
2.
In the screen Projects select +New.
3.
Input a Name for the new project.
4.
Load an existing standard or create a new one; edit the standard if needed.
5.
Select an existing test series or create a new one.
6.
Add measurements to your new project.
7.
To end project management, select the Home icon.
NOTICE
The color for each measurement indicates the Pass / Fail result according to the value(s)
entered in the standard.
10
BYK-Gardner GmbH
293 026 162 - 2210

Publicidad

loading

Productos relacionados para BYK haze-gard i Family