Descargar Imprimir esta página

Thomas Regout Regout Balance Systems e-Box II Manual De Instalación página 9

Publicidad

Use the holes in the bottom of the VESA box to guide the control panel [J]* to the front side. Guide the cables
8
inside the VESA box and use cable ties for cable management. Cut the excessive cable ties length.
C
* The type of control panel depends on the e·Box
OR
9
e·Box
8b) Make sure the cable is
fully plugged into the slot.
8a) Control panel into slot A2
J
A2
®
model
®
II Mobile stand
CLICK
OR
EN

Publicidad

loading

Este manual también es adecuado para:

487a11