Descargar Imprimir esta página

Commercial Electric SHOP3/840/MOT/SOL/HD Guía De Uso Y Cuidado página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Installation (continued)
□ The solar shop light is shipped with batteries preinstalled.
□ Select a location with full and direct sunlight. If installed in a shady area, the battery may not fully charge, resulting in the reduction of
working hours.
□ Before using the solar shop light, charge the batteries to full capacity after placing solar panel at a selected location. This initial charge
should be done with the shop light connected and in the OFF position. The batteries will reach full charge after two full days of sunlight.
□ Wipe the panel every few months to remove dust or debris that might affect the solar charge efficiency.
□ Before starting any installation, test the shop light for illumination.
- Push the POWER button on the shop light to turn ON light.
- The shop light should illuminate.
- If no light appears, cover the light sensor at the opposite end of the shop light to prevent light penetration.
- If the light does not illuminate, examine the battery compartment to ensure that the batteries are properly positioned. This can be
done by following battery replacement instructions on page 9.
Screw Hook and Chain Installation
1
a
Attaching two screw hooks to a
Measure and mark the location for the self-drilling
drywall anchors (II). Drill pilot holes through the drywall
using a 3/16 in. bit and cordless drill. Drive the
self-drilling drywall anchors (II) into the pilot holes using
the drill. Manually tighten the screw hooks (HH) into the
self-drilling drywall anchors (II).
NOTE: The spacing between the screw
hooks (HH) should be 35 3/8 in.
II
HH
2
Fastening the hanging chain to
the S-hook
Insert the S-hook (GG) into the mounting hole located on
the back of the solar shop light (AA). Repeat this step on
the opposite end.
AA
35 3/8 in.
ceiling
ceiling
GG
1
b
Attaching two screw hooks to a
wooden ceiling
Measure and mark the location. Drill pilot holes through
the wood using a 7/64 in. bit and cordless drill. Manually
tighten the screw hooks (HH) into the pilot holes.
II
HH
3
Hanging the shop light
Mount the 18 in. hanging chain (FF) onto the screw
hook (HH). Mount the S-hook (GG) onto the hanging
chain (FF). Repeat this step on the opposite end.
4
NOTE: No anchors needed. The spacing
between the screw hooks (HH) should be
35 3/8 in.
35 3/8 in.
ceiling
ceiling
HH
ceiling
ceiling
HH
FF
GG
HH
AA

Publicidad

loading

Este manual también es adecuado para:

1007 155 949