Descargar Imprimir esta página

MSW Motor Technics MSW-M-PT-13L-20L Manual De Instrucciones página 17

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 64
3.2. Preparations for operation
1. Release locking catches located on both sides of the toilet. Divide the top
[2] and bottom tanks [3] (fig. 1).
2. Place the bottom tank [3] vertically with the cap upwards. Unscrew the cap
and fill the liquid intended for faeces tanks (acc. to the instructions on the
packaging). Screw the cap (fig. 2).
3. Place the top tank on the bottom tank and lock the locking catches (fig. 3).
4. Unscrew the cap of the top tank and fill it with clean water. Screw the cap
(fig. 4).
CAUTION! It is forbidden to add the liquid intended for faeces tanks to the
clean water tank!

Publicidad

loading

Este manual también es adecuado para:

Msw-m-pt-13l-10l