2.7.1 How to Tap a Keg of Beer / Sankey Type Barrel
1. Connect line from pressure source to
tap nipple (use clamp).
2. Using coupling washer connect beer
line to thread on probe. Holding
flats on probe with wrench tighten
wing nut or hex nut on beer hose.
3. Align tap with lugs in barrel, insert
tap.
4. Turn tap body handle ¼ turn clock
wise until tight to secure tap to
barrel. Turn on pressure regulator.
Rotate wheel handle ¼ turn clock wise.
Be certain handle is turned as far as it
will go to stop. This will assure that the
beer and gas pots in the keg down tube
will be fully opened.
2.8
Install the Air Channels and Draft Towers
This procedure describes how to install the air channel needed to provide cold
air directly into the beer towers.
Tools needed: Philips Screwdriver
Step 1
Locate the gaskets and
bolts
included
in
your Tower. Place gasket
over the pre-drilled holes
and place the 4 screws
thru the tower base. Align
the tower with screws and
gasket to the cabinet top
as
shown
below
while
dropping the beer line(s)
thru the top of the unit.
Identify the "WHITE
HOSE" which is found
Manual Instructions
with
Step 3
inside of the
equipment.
5
fagorindustrial.com
Step 2
Tighten the screws using the
nuts found in your tower
box.
Step 4
Introduce the "WHITE
HOSE" which is found
inside of the
equipment into the
tower's hole.
Be sure that the
hose's hook is
correctly attached
into the tower hole.