Hydraulic installation
At the bottom of the bathtub, right below
the registers, there are two 1/2" connections,
where the power supply must be connected,
being one for cold water and the other for hot
water.
The points for hot and cold water should
reach the bathtub without going through a
mixer, going only through the general register.
The hot and cold mixing is done through the
registers that come with the bathtub. When ins-
talling the hookup, make sure that hot water is
connected to the left-hand register and cold
water to the right-hand register.
For bathtubs that do not have hot and
cold registers on the rim, the registers should be
installed on the wall and the water should
already arrive mixed in the tub. The 1/2" water
inlet is located at the bottom of the tub.
The power supply points (electric, hot and
cold water) of the bathtubs should be installed
on the wall where the bathtub will lean, about 30
cm away from the floor (fig. 1).
The hot and cold water inlet must be
made by 1/2" fittings located in the lower part
(fig. 3).
3
Hot water
Vancouver and Verona models
22
have lateral closing panels all around, therefore,
the power supply points (electric, hot and cold
water) and sewage must be installed embedded
in the floor (figs. 2 and 4).
versions already come from the factory with two
1/2" flexible metal fittings that must be con-
nected to the hot and cold water. These fittings
are located right below the rim stops (fig. 5).
Cold water
The Vancouver and Verona bathtubs
4
The other bathtubs in the Première
5
Hot water
Barcelona, California, Cayman,
Double Cayman and Noronha models
Hot water
Sewage
Cold water
Electric
Cold water