4. Further secure the System Control Box to the Cabinets with the 32 provided
M6x10mm screws.
5. Connect the Network and Power cables of the Cabinets to the System Control Box.
NOTE:
There are four (4) Network and eight (8) Power cables to connect.
Network 1
Network 2
Network 3
Network 4
Power
14