QP = Protection panel
P
= Electric pump 1(2,3)
1(2,3)
TR = Transducer
INV
= Inverter 1(2,3)
1(2,3)
A
= Magnetic core
1(2,3)
B
= Magnetic core
1(2,3)
C
= Magnetic core
1(2,3)
Notes:
- for connecting the protection panel to the power supply line, see the attached panel manual
- The connections with dash lines are the responsibility of the installer
Note: Magnetic core application "A","B","C" (E-SPD+ model TT11000)
For E-SPD+ model TT11000, is necessary to install three magnetic cores: one in the power cable of the frequency converter,
one will be installed on the outside, as close as possible to the cable gland (A). In the cable between the frequency converter
and the motor, one must be installed that groups all the cables (B) and another that only groups the 3 phases without the
ground (C).
VERSION WITH ON-BOARD PUMP INVERTER (E-SPD+ TT11000)
ENGLISH
16