Descargar Imprimir esta página

HTW ESSENTIAL ECO -TV-30ESSECO Manual De Usuario E Instalacion página 21

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Connection of pipelines
The dimension of multifunction
valve and the inlet /outlet pipe is
½"BSP.
Connection of multifunction valve:
install the multifunction valve with the
heater on the inlet of the water
heater.
In order to avoid leakage when
connecting the pipelines, the rubber
seal gaskets provided with the heater
must be added at the end of the
threads. Ensure leak proof joints.
The discharge pipe connected to the
pressure relief device must be kept
open to the atmosphere and be
installed in a frost-free environment
with a continuous downward slope.
Multi outlet connection
lf the users want to install a multi-way supply system, refer to the method
shown in Fig.4 for connection of the pipelines.
Joint
Hot water
outlet
5
o
ne-way safety valve
Pressure release hole
Joint screw for
cold water inlet
One-way safety valve
Water inlet valve
Cold water supply
( Fig. 3 )
( Fig. 4 )

Publicidad

loading