Descargar Imprimir esta página

Bohle Aqua Drill Pro Manual De Funcionamiento página 14

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
06 Maintenance
In addition to regular cleaning of the machine,
the following must be observed:
Always keep ventilation slots clear.
Do not allow water from outside to enter
the machine!
When finished working, empty remaining
water from the water feed chuck, close the
ball valve and put the yellow plastic protec-
tive cap on.
Always store the machine in its case.
When charging the batteries, always
charge them as fully as possible.
14
07 Malfunction and Repair
If water escapes from the check drill
in the housing, you must stop
operating the machine immediately.
Damage can result!
In this case the complete water feed
chuck must be replaced
(Art. SP 79.BG304)
08 Warranty
The warranty terms of Bohle AG apply
exclusively.
Check drill

Publicidad

loading

Productos relacionados para Bohle Aqua Drill Pro

Este manual también es adecuado para:

Bo 79.304