System "B": (P9.P10)
In case of impossibility to install the
drainage pipe as showed on "A" system,
please use system "B" to drain the
condensate moisture to a suitable place.
If use system "B", please block the black
rubber cup from system "A".
Take out the cover from the unit, and cut
the cover as the label shows, then connect
the drainage pipe from the bottom system
"B" hole. (3.10 will show how to remove
and fix the cover accordingly)
Usually "B" holes is used in the installation
when the outside temperature is very low,
and in this way we prevent no ice in the
discharge water pipe.
This solution is used also to be much easy
for the installer to connect the internal
drainage pipe when he does not want to
see the pipe from outside.
2.4 FASTENING THE BRACKET (P11)
‐Drill the holes for anchoring the fastening
bracket to the wall using preferably the 9
holes showed in black on the paper
template.
‐The anchor bolts provided require a 8mm
hole. The wall should be inspected to
determine if provided bolts are useful or if
it is necessary to use a different
anchorage. The manual facture is not
liable in case of underestimation of the
structural consistency of the anchorage
made at the time of installation.
2.5 INSTALLATION OF THE PIPES (P12)
‐ After drilling the holes, the plastic sheet
supplied with the air conditioner need to be
fitted through them.
‐ Measure the depth of the wall and cut supplied
plastic sheet.
‐ Roll the sheet and insert it into the hole, paying
attention to the joint line, which must be always
upper position. Remember that the sheet must
have the same inclination of the holes(min 3°).
P9
P11
P12
EN
P10